CSA Z318.2-95 (R2001)
- Comments Off on CSA Z318.2-95 (R2001)
- CSA
Click here to purchase
1. Scope
1.1
General This Standard applies to the commissioning of building control systems in health care facilities. It is a companion document to the other Standards in the CSA Z318 Series of Standards.
1.2
This Standard identifies the role of the commissioning team in the design, construction, and implementation of the building control system.
1.3
This Standard is intended to assist the commissioning team in the preparation of a commissioning plan. The commissioning plan specifies commissioning requirements and project coordination for newly installed or renovated building control systems. It includes (a) the human and financial resources required to accomplish commissioning; and (b) the responsibilites of the commissioning team; and (c) the timing and integration of the commissioning process.
1.4
Limitations This Standard does not cover the control devices of stand-alone or specialty medical equipment, eg, the remote controls of an angiography suite, on the premises of a health care facility.
Product Details
- Published:
- 02/11/2000
- Number of Pages:
- 121
- File Size:
- 1 file , 4.3 MB