CGA P-89

Click here to purchase

This publication provides recommendations and minimum requirements for the design and safeguards of utility and instrument gas systems and their interconnections, both permanent and temporary. It includes startup systems as well as maintenance and continuous purge connections. It identifies the potential hazards resulting from the connections between purge gases, instrument gases, and the process. These requirements may also be considered for existing facilities.

Product Details

Edition:
1
Published:
11/05/2021
Number of Pages:
26
File Size:
1 file , 710 KB
Note:
This product is unavailable in Belarus, Russia, Ukraine