BS PD 5500:2018
- Comments Off on BS PD 5500:2018
- BS
Click here to purchase
BS PD 5500:2018 specifies requirements for the design, construction,inspection, testing and verification of compliance of new unfired fusion weldedpressure vessels. The materials of construction are specified in Section 2. Theterm “pressure vessel” as used in this specification includes branches up to thepoint of connection to the connecting piping by bolting, screwing or welding,and supports, brackets or other attachments directly welded to the pressurecontaining shell. The term “unfired” excludes vessels that are subject to directgenerated heat or flame impingement from a fired process. It does not excludevessels subject to electrical heating or heated process streams.
Product Details
- Edition:
- 7th
- Published:
- 01/01/2018
- Number of Pages:
- 1026
- File Size:
- 1 file , 35 MB
- Note:
- This product is unavailable in United Kingdom