1.1 This practice covers the requirements for inspection and acceptance of installed reinforced concrete pipe by either person-entry, or remote inspection as shown in Figs. 1 and 2, respectively.
FIG. 1 Person Entry Inspection
Product Details
Published:
09/01/2022
Number of Pages:
9
File Size:
1 file , 510 KB
Redline File Size:
2 files , 1.4 MB
Note:
This product is unavailable in Russia, Ukraine, Belarus