ASTM C1554-18(2023)

Click here to purchase

1.1 Intent: 

1.1.1 This guide covers materials handling equipment used in hot cells (shielded cells) for the processing and handling of nuclear and radioactive materials. The intent of this guide is to aid in the selection and design of materials handling equipment for hot cells in order to minimize equipment failures and maximize the equipment utility.

Product Details

Published:
02/01/2023
Number of Pages:
10
File Size:
1 file , 360 KB
Note:
This product is unavailable in Russia, Ukraine, Belarus