AS 5092-2009
- Comments Off on AS 5092-2009
- AS
Click here to purchase
Specifies requirements for the design, construction, operation and maintenance of compressed natural gas (CNG) refuelling stations which can be one of the following: (a) fast fill, where vehicles are filled in a period of minutes, analogous to liquid refuelling; (b) time fill, where one or (in most cases) a number of vehicles are filled simultaneously over a period of some hours; or (c) a combination of fast fill and time fill.
Product Details
- Edition:
- 1st
- Published:
- 10/01/2009
- ISBN(s):
- 073379260
- Number of Pages:
- 36
- File Size:
- 1 file , 550 KB
- Product Code(s):
- 10148228, 10148272, 10148245