2005 ASHRAE Technology Awards: It's in the Details – Engineering for Low Cost and High Efficiency

Click here to purchase

The Electronic Arts Phase II building (EAII) serves as the headquarters for Electronic Arts, a video game developer located outside San Francisco. It was completed in 2002. The building is 350,000 ft2 (32 515 m2),four stories tall, and includes offices, an atrium, cafeteria, child care center, and auditorium. There is nothing particularly “sexy” about the mechanical system—no thermal storage tanks or ground-coupled heat rejection. Yes, it has many state-of-the-art features such as underfl oor air distribution and a primary-only, variable fl ow, chilled water plant, but this is not why EAII earned an ASHRAE Technology Award.

Citation: ASHRAE Journal, Vol. 47, No. 10

Product Details

Published:
2005
Number of Pages:
4
File Size:
1 file , 730 KB
Product Code(s):
D-26920